To: Weiskotten Hall Addition Email List <wha-utility at lists.upstate.edu> <wha-utility at lists.upstate.edu>; Weiskotten Hall - Setnor Hall Email List <wh-set-utility at lists.upstate.edu> <wh-set-utility at lists.upstate.edu>; Medical Library Email List <lib-utility at lists.upstate.edu>; nab-utility at lists.upstate.edu; Silverman Hall - Building 49 Email List <sil-b49-utility at lists.upstate.edu>
Subject: [nab-utility] Power Outage: WH, WHA, NAB, Silverman & Med Library


To support the ongoing Weiskotten Hall power upgrade project,  we need to conduct a power outage affecting NAB, Silverman Hall, and the Medical Library on 1/10/2026 to allow a safe work area for the electrical contractors.



During this time, there will only be emergency power available, meaning power will be available to entrance/exit stairwell lighting and emergency exit signs only. Additionally, WHA will experience a " blip" like the monthly generator testing at both 0600 and 0800.



This outage will be started at 0600 hours so as not to interfere with usage of the buildings and be completed by 0800 hours.  Most of the buildings should be vacant during these hours.



If you have any questions or concerns please feel free to contact me.



John Ders

315-243-5974


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.upstate.edu/pipermail/chpfacultystaff/attachments/20260105/2f35dda0/attachment.html>


More information about the CHPFacultyStaff mailing list