[CHPFacultyStaff] FW: Power shutdown WHA 9th floor
Mary Dimura
DIMURAM at upstate.edu
Wed May 20 08:03:09 EDT 2026
From: Wha-utility <wha-utility-bounces at lists.upstate.edu> On Behalf Of Yvette Stewart
Sent: Wednesday, May 20, 2026 7:22 AM
To: Weiskotten Hall - Setnor Hall Email List <wh-set-utility at lists.upstate.edu>; Weiskotten Hall Addition Email List <wha-utility at lists.upstate.edu>; AOCCCDT <AOCCCDT at upstate0.onmicrosoft.com>
Subject: [util] Power shutdown WHA 9th floor
Our original date for this shutdown was May 15th and has been rescheduled to accommodate testing in the area.
The new date is Friday May 22nd
On Friday, May 22nd, power to the 9th floor of WHA will be shut down to allow the contractor to continue work required for the WHA power upgrade.
Panel H9M feeds kitchen equipment and on Fridays the kitchen is shutdown allowing us the time to do this work.
Panel L8 is a lighting panel on 8 of WHA and the 8th floor will be without general lighting. There will be emergency lighting.
Power off is estimated at 2 hours.
The start time would be 6:30 AM for drilling into the panels with power outage to occur following.
The drilling will occur early in the morning to reduce the noise throughout the building.
If there are any questions or concerns, please feel free to contact me at 315-243-5974.
John Ders
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.upstate.edu/pipermail/chpfacultystaff/attachments/20260520/b4136e9f/attachment.html>
-------------- next part --------------
An embedded and charset-unspecified text was scrubbed...
Name: ATT00001.txt
URL: <http://lists.upstate.edu/pipermail/chpfacultystaff/attachments/20260520/b4136e9f/attachment.txt>
More information about the CHPFacultyStaff
mailing list