[Cwb-roc-cc-utility] UH Stairwell 3.

Thomas Slater SLATERT at upstate.edu
Thu Mar 21 08:37:39 EDT 2024


Stairwell #3 located in University Hospital Main Lobby across from the Main Elevators will have a running closure for the next two weeks starting on March 18th from 7 AM to 3 PM.



In an effort to upgrade the power in the IMT Closets. The contractor will need to access the chase in Stairwell 3.



This is what you can expect for Thursday, March 21st.



Working at the 4th  floor,  no access to or from the stairwell will be available while electrical work is going on.

You will be able to walk past the work area while in the stairwell on all the  floors.  The door area is where the work is.



Once we move to a lower floor you will not be able to enter or exit at that floor.



If you have any questions or concerns please feel free to contact John Ders at 315-243-5974.

Physical Plant
Maintenance Operations Center
Room UH-1806

Email:  mocenter at upstate.edu
Phone:  X 4-4230
Facsimile:  X 4-4711

Normal hours of operation:
Monday through Friday, 07:00 - 16:30

[cid:c4f99dfb-9eba-4f43-b38d-f6d6be33401c]
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.upstate.edu/pipermail/cwb-roc-cc-utility/attachments/20240321/f14e4715/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Outlook-ybznmamc.png
Type: image/png
Size: 29579 bytes
Desc: Outlook-ybznmamc.png
URL: <http://lists.upstate.edu/pipermail/cwb-roc-cc-utility/attachments/20240321/f14e4715/attachment-0001.png>


More information about the Cwb-roc-cc-utility mailing list