[epicdown] REMINDER: Epic Production System Downtime SUNDAY, September 8th from 4:00 AM - 6:00 AM - Read Only System will be available
Jacob Peck
PeckJ at upstate.edu
Sun Sep 8 03:45:26 EDT 2024
The Epic Production system will be temporarily unavailable Sunday, September 8th, 2024, from 04:00 AM until 06:00 AM to activate our DR (Disaster Recovery) system
The Epic Downtime Read-Only (DRO) System WILL be available during these times.
[undefined]
While this is a planned downtime, here is a hyperlink to our downtime mitigation tools tip sheet in the unanticipated event that downtime level escalation is needed mitigation_tools_for_bca_1.pdf (upstate.edu)<https://www.upstate.edu/training/intra/epic/documents/mitigation_tools_for_bca_1.pdf>
There will not be any special updates applied to the Epic application during this time as we are only testing our DR (Disaster Recovery) process.
We appreciate your cooperation and patience.
Jacob M. Peck
Enterprise Storage and Unix Systems Administrator
SUNY Upstate Medical University
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.upstate.edu/pipermail/epicdown/attachments/20240908/4290d5a3/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.png
Type: image/png
Size: 32567 bytes
Desc: image001.png
URL: <http://lists.upstate.edu/pipermail/epicdown/attachments/20240908/4290d5a3/attachment-0001.png>
More information about the EpicDown
mailing list