From TarantiJ at upstate.edu Fri May 1 08:08:40 2026 From: TarantiJ at upstate.edu (Jason Tarantino) Date: Fri, 1 May 2026 12:08:40 +0000 Subject: [util] East Tower Generator Test Notice Message-ID: TO: Department Heads, Department Chairmen & Hospital Administration DATE: May 2026 SUBJECT: Generator Test: East Tower The next monthly test is scheduled for Tuesday, May 19, 2026. THE EAST TOWER GENERATOR TEST PROCEDURES ARE AS FOLLOWS: ? The test will be announced over the paging system fifteen minutes prior to the test (5:00AM). ? The emergency generators will be started between 5:00AM and 5:05AM and used as the source for the emergency power feed for approximately 60 minutes. ? Emergency power will be switched back to the electrical feed between 6:35AM and 6:45AM when the generators are turned off. ? Completion of the test will be announced over the paging system. ? Users of emergency power will notice a series of sequential blinks at the beginning of the East Tower test (one per electrical zone) as each of the 14 emergency power switches are engaged. At the end of the test, all areas will blink (yellow) as the switches return their respective areas to normal power. ? Elevators in the East Tower may stop and start during power transition. If an unavoidable emergency arises close to the time that the emergency generator test is scheduled and you feel that a brief power interruption would be detrimental to patient care, immediately contact the Maintenance Operations Center at 4-4230. The test, although intended to simulate an actual power outage, has been modified to keep the disruption to Hospital services at a minimum. If an actual power outage occurs, the electrical circuits supported by the generator will be without power for 5 to 10 seconds except for those areas which have their own uninterruptible power supplies. Our recent experience suggests that a real power outage can be expected once a year. If you have equipment, processes, etc. that cannot cope with a power outage of this duration, your department should consider installing uninterruptible power supplies (UPS's). If you have any questions or concerns regarding the test or the emergency power system, please feel free to contact Marc Dingle, Electrical Facilities Manager at 4-8923 or 680-323-1819. Your continued cooperation in completing the code mandated emergency diesel generator test is greatly appreciated. Thank you. Reviewed 3-23-21 Best regards, Jason Tarantino Administrative Assistant Trainee 2 Physical Plant ? Maintenance Operations Center Upstate Medical University Room 1806 ? 315-464-4230 Tough times don?t last, but tough people do. ? Robert H. Schuller [image] -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: Outlook-image.png Type: image/png Size: 6554 bytes Desc: Outlook-image.png URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: East Tower Generator Test Notice.pdf Type: application/pdf Size: 171445 bytes Desc: East Tower Generator Test Notice.pdf URL: From SLATERT at upstate.edu Fri May 1 14:34:11 2026 From: SLATERT at upstate.edu (Thomas Slater) Date: Fri, 1 May 2026 18:34:11 +0000 Subject: [util] 1162 OR 7 - Davinci Robotics Shutdown. Message-ID: Good afternoon, The OR7 contractor needs to perform a shutdown on the reheat loop that serves all rooms in the East Wing floors 2-6. This shutdown is needed to facilitate the replacement of the reheat coil line in rm E5622B. We have scheduled this work to begin on Tuesday, 05/05/26 at 2200, with an estimated completion time of 0400 on 05/06/26. During this shutdown, we will have limited control over individual room temperatures, but we should be able to make most adjustments with the fan systems for minimal impact. This will also affect the Main ORs on the 5th floor and the Burn Unit on the 6th floor. We should be able to accommodate any temp adjustments needed for emergency cases in the ORs as needed. Space heaters will be available for the Burn Unit as needed. ***Airflow will not be affected by this shutdown*** Any questions should refer to Zekrullah Ahmady 315-518-8181/AhmadyZ at upstate.edu -------------- next part -------------- An HTML attachment was scrubbed... URL: