[util] CONSTRUCTION NOTICE / WEDNESDAY, JULY 28TH /

Mary E. Lent LentM at upstate.edu
Tue Jul 27 09:29:50 EDT 2021


On July 28th, 2021, a concrete truck will be placed off Memorial Drive from 7 AM to 9 AM adjacent to the trash dumpster. Traffic through Memorial Drive will remain in operation throughout the duration. The contractor will transport the concrete in a covered wheel barrow into the blue elevators on the 4th floor of the east wing. The contractor will take the elevator to the 7th floor and proceed into the mechanical room per the path indicated on the attached PDFs.

Please contact me with any questions or concerns. Thank you.

[cid:image001.jpg at 01D782C8.78392500]

Tyler Eisgruber, EIT
Mechanical Facilities Engineer // Project Manager
Facilities Engineering
SUNY Upstate Medical University
Phone: 315-399-8349


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.upstate.edu/pipermail/ew-bh-utility/attachments/20210727/63766d5a/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.jpg
Type: image/jpeg
Size: 85768 bytes
Desc: image001.jpg
URL: <http://lists.upstate.edu/pipermail/ew-bh-utility/attachments/20210727/63766d5a/attachment.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: 3. FOURTH FLOOR.pdf
Type: application/pdf
Size: 93418 bytes
Desc: 3. FOURTH FLOOR.pdf
URL: <http://lists.upstate.edu/pipermail/ew-bh-utility/attachments/20210727/63766d5a/attachment.pdf>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: 6. SEVENTH FLOOR.pdf
Type: application/pdf
Size: 233015 bytes
Desc: 6. SEVENTH FLOOR.pdf
URL: <http://lists.upstate.edu/pipermail/ew-bh-utility/attachments/20210727/63766d5a/attachment-0001.pdf>


More information about the Ew-bh-utility mailing list