[util] Electrical Power Interruption for the IHP, Saturday, November 7th, from 2:00 to 8:00 am
Mary E. Lent
LentM at upstate.edu
Wed Oct 21 09:51:36 EDT 2020
On Saturday November 7th from 2:00 am - 8:00 am we will be conducting a shutdown of the normal electrical power for the southern half of the IHP Building, floors 1- 4. Please see attached plans for the impacted areas. During this time lighting and normal power outlets will not be in service. Any equipment connected to the red emergency power outlets will not be impacted. This shutdown is being executed to provide power to the Institute for Climate and Health project that is currently under construction on the 4th floor.
If you have critical equipment that will require power during this outage, or have any questions please contact Matt Blair at blairma at upstate.edu<mailto:blairma at upstate.edu> . In your email please include your name, room number, along with a detailed description of what is needed during this outage.
Kind regards,
Matthew Blair, RA, NCARB
Architect / Project Manager
Upstate Medical University
Design & Construction
Office: 315-464-3813
Cell: 315-430-3951
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.upstate.edu/pipermail/ihp-utility/attachments/20201021/1080e2bf/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: IHP Electrical Shutdown_11.7.2020.pdf
Type: application/pdf
Size: 2164657 bytes
Desc: IHP Electrical Shutdown_11.7.2020.pdf
URL: <http://lists.upstate.edu/pipermail/ihp-utility/attachments/20201021/1080e2bf/attachment.pdf>
More information about the Ihp-utility
mailing list