[util] National Grid Update
Brittany Sprague
SpragBri at upstate.edu
Fri May 9 09:11:24 EDT 2025
“Last evening, National Grid experienced an electrical issue that caused the IHP/NRB buildings to switch to their alternate source of power.
Once stability of the normal supply is verified, we will send out another notification with the date/time we will be switching back to the preferred source.
Please call Marc Dingle, Electrical Facility Manger with any questions at 4-8923”
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.upstate.edu/pipermail/ihp-utility/attachments/20250509/5116334b/attachment.html>
More information about the Ihp-utility
mailing list