[util] Generator Test
Jason Tarantino
TarantiJ at upstate.edu
Wed Jul 1 12:27:49 EDT 2026
TO: All Departments with Space in the Campus Activities Building
DATE: July 2026
SUBJECT: Generator Test: Campus Activities Building
The next monthly test is scheduled for Friday, July 24, 2026.
THE CAB TEST PROCEDURES ARE AS FOLLOWS:
* The emergency generator will be starting between 7:00AM and 7:05AM and willbe used as the source for emergency power for approximately 30 minutes.
* The emergency power will be switched back to normal operations between 7:30AM and 7:35AM when the generator turns off.
* Emergency outlets (red) and emergency lights will blink when the test starts and again when it ends.
The test, although intended to simulate an actual power outage, has been modified to keep the disruption to services at a minimum. If an actual power outage
occurs, the electrical circuits supported by the generator will be without power for 5 to 10 seconds except for those areas which have their own uninterruptible power supplies.
Our recent experience suggests that a real power outage can be expected once a year.
If you have any questions or concerns regarding the test or the emergency power system, please feel free to contact Marc Dingle, Electrical Facilities Manager at 4-8923 or 680-323-1819.
Your continued cooperation in completing the code mandated emergency diesel generator test is greatly appreciated.
Thank you.
Jason Tarantino
Administrative Assistant Trainee 2
Physical Plant – Maintenance Operations Center
Upstate Medical University
Room 1806
📞 315-464-4230
Tough times don’t last, but tough people do.
— Robert H. Schuller
[image]
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.upstate.edu/pipermail/jh-cab-ct-utility/attachments/20260701/a410135b/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image.png
Type: image/png
Size: 6554 bytes
Desc: image.png
URL: <http://lists.upstate.edu/pipermail/jh-cab-ct-utility/attachments/20260701/a410135b/attachment.png>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: CAB Generator Test Notice.pdf
Type: application/pdf
Size: 125450 bytes
Desc: CAB Generator Test Notice.pdf
URL: <http://lists.upstate.edu/pipermail/jh-cab-ct-utility/attachments/20260701/a410135b/attachment.pdf>
More information about the Jh-cab-ct-utility
mailing list