[util] CANCELLATION OF NOTICE
Anne Hodges
HodgesA at upstate.edu
Thu Jun 26 14:15:34 EDT 2025
.
Due to predicted inclement weather, the work detailed in the below notice has been CANCELLED.
You will be informed of reschedule date.
If you have any questions, please contact Marc Dingle, of Physical Plant, at 680-323-1819 or Ext. 48923.
Anne Hodges, Office Assistant 2
Physical Plant - Maintenance Operations Center
Upstate Medical University Room 1806
315-464-4230
________________________________
From: Ew-bh-utility <ew-bh-utility-bounces at lists.upstate.edu> on behalf of Anne Hodges <HodgesA at upstate.edu>
Sent: Tuesday, June 24, 2025 8:39 AM
To: East Wing - Boiler House Email List <ew-bh-utility at lists.upstate.edu>; East Tower Email List <et-utility at lists.upstate.edu>; Weiskotten Hall Addition Email List <wha-utility at lists.upstate.edu>; Weiskotten Hall Addition Email List <wha-utility at lists.upstate.edu>; nab-utility at lists.upstate.edu <nab-utility at lists.upstate.edu>; Silverman Hall - Building 49 Email List <sil-b49-utility at lists.upstate.edu>; Medical Library Email List <lib-utility at lists.upstate.edu>; Gamma Knife Email List <gamma-utility at lists.upstate.edu>; NMDT <NMDT at upstate.edu>; SUPADMDT <SUPADMDT at upstate.edu>
Subject: [util] Electrical Power Interruptions
Electrical Power Interruptions Notice for East Wing, East Tower, Weiskotten Hall, Weiskotten Hall Addition, NAB, Silverman, Setnor University Hospital and Medical Library, CWB, Gamma Knife
TO: All Departments with Space in the above listed buildings
FROM: Marc Dingle, Electrical Facilities Manager
SUBJECT: Electric Power Interruptions
TODAY’S DATE: June 24, 2025
Date of work: Saturday, June 28, 2025, 5am - 7am & 7pm - 9pm
In order to perform preventive maintenance on our 35kv ASH 24 Feeder, Banks 2 & 4. All buildings mentioned above will be affected for a brief time. The weather delay date is July 26th, 2025. You will receive another notice if PM is cancelled.
Weiskotten Hall Addition, Setnor, NAB, Silverman and Medical Library; between the hours of 5 am and 7 am Saturday normal power (non-red) outlets will see a blip in power while we switch. Critical equipment will need to be plugged into the red emergency power outlets. The elevators in WHA will also be offline until switching is completed each time. Between 5 and 7 am and 7 and 9 p.m. the buildings will see a blip in power while we switch back.
East Wing, East Tower; between the hours of 5 am and 7 am. Saturday, normal power (non red) outlets will see a blip while we switch. Critical equipment will need to be plugged into the red emergency power outlets. MRI #1 and the Toshiba ED CT will need to be offline during switching in EW.
* Only EW ORs 4, 6, 7, 9 & 13 should be used prior and during EW switching. After switching is complete All ORs are able to be used.
* Saturday evening after work is complete, the buildings will be seeing a blip between 7 p.m. and 9 p.m. While we switch back. If we are not able to perform switching due to activities going on in the building, we will do switching on Monday morning. June 30, 2025, between 5 and 7 am.
University Hospital, Weiskotten Hall, & Computer Warehouse Building (CWB): Between the hours of 5 am and 7 am. Saturday, normal power (non-red) outlets will see a blip while we perform end of day switching. Critical equipment will need to be plugged into the red emergency power outlets.
All other campus buildings (Cancer Center, IHP & IHP Expansion, etc.) are not affected.
If you have any questions, please contact Marc Dingle, of Physical Plant, at 680-323-1819 or Ext. 48923.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.upstate.edu/pipermail/lib-utility/attachments/20250626/fafb004b/attachment.html>
-------------- next part --------------
An embedded and charset-unspecified text was scrubbed...
Name: ATT00001.txt
URL: <http://lists.upstate.edu/pipermail/lib-utility/attachments/20250626/fafb004b/attachment.txt>
More information about the Lib-utility
mailing list