In support of the ongoing WHA power upgrade, On May 4 & 5, 2026, the electrical contractor needs to shut down the normal power to the following areas in WHA: 8303, 8303A, 8303B, 8305, 8322. Those rooms are on the middle of the hall near the elevators.
No Emergency Power will be affected
This will be a two-day affair. Due to the researcher needing access to the middle room, we will only be able to change one panel and install the feeder each day but the two labs off the middle room will have to have the normal power shutdown.
I have been in contact with the researcher and customers affected.
The power is scheduled to be down starting at 6:00 AM until 2:30 PM (7 hours) each day. This will allow the contractor to disconnect existing circuitry in the chase panel and relocate/refeed circuits to previously installed temporary power panels and do the same with the existing room panels.
If you have any questions or concerns, please feel free to contact me at 315-243-5974.
John Ders
Best regards,
Jason Tarantino
Administrative Assistant Trainee 2
Physical Plant – Maintenance Operations Center
Upstate Medical University
Room 1806
📞 315-464-4230
Tough times don’t last, but tough people do.
— Robert H. Schuller
[image]
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.upstate.edu/pipermail/lib-utility/attachments/20260430/5274b43f/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Outlook-image.png
Type: image/png
Size: 6554 bytes
Desc: Outlook-image.png
URL: <http://lists.upstate.edu/pipermail/lib-utility/attachments/20260430/5274b43f/attachment.png>
More information about the Lib-utility
mailing list