[util] MED LIBRARY ATS 08 22
Ana Santiago
SantiaAn at upstate.edu
Thu Aug 20 09:17:02 EDT 2026
UPSTATE PHYSICAL PLANT
NOTIFICATION
Notification Type:
Planned Outage
☐Other: __________________________
Utility / Service Affected:
Electrical
☐Other: __________________________
Subject:
To support: Replacement of Life Safety transfer equipment
Please review the details below:
Date:
8/22/2026
Time(s):
0500
Location:
Medical Library
Affected Areas / Equipment
(Room, Equipment ID, etc.):
Generator Power
Impact (What will be interrupted
and what will remain operational):
There will be NO generator power for the duration of the shutdown.
Note:
The contractor stated this may be an 8 – 12 hour shutdown.
Questions or Concerns
If you have any questions or concerns, please contact:
Name:
Marc Dingle
Name:
Department:
Physical Plant
Department:
Phone:
680 – 323 - 1819
Phone:
Email:
dinglem at upstate.edu
Email:
Thank you for your cooperation and understanding while this work is being completed.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.upstate.edu/pipermail/lib-utility/attachments/20260820/8f197a80/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: MED LIBRARY ATS 08 22.docx
Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document
Size: 38775 bytes
Desc: MED LIBRARY ATS 08 22.docx
URL: <http://lists.upstate.edu/pipermail/lib-utility/attachments/20260820/8f197a80/attachment.docx>
More information about the Lib-utility
mailing list