From HodgesA at upstate.edu Mon Dec 1 07:00:00 2025 From: HodgesA at upstate.edu (Anne Hodges) Date: Mon, 1 Dec 2025 12:00:00 +0000 Subject: [util] Generator Test: 550 Harrison Message-ID: TO:????????? All Departments with Space in 550 Harrison DATE:??????? December 2025 SUBJECT:????Generator Test: 550 Harrison Generator testing for 550 Harrison is scheduled for Monday, December 15, as follows: ???? THE 550 HARRISON TEST PROCEDURES ARE AS FOLLOWS: ??????The emergency generator will be started between 5:00AM and 5:05AM and will be used as the source for emergency power for approximately 30 minutes. ??????The emergency power will be switched back to normal between 5:30AM and 5:35AM when the generator turns off. ??????Emergency (red) outlets and emergency lights will blink when the test starts and again when it ends. The test, although intended to simulate an actual power outage, has been modified to keep the disruption to hospital services at a minimum. If an actual power outage occurs, the electrical circuits supported by the generator will be without power for 5 to 10 seconds except for those areas which have their own uninterruptible power supplies. Our recent experience suggests that a real power outage can be expected once a year. If you have equipment, processes, etc. that cannot cope with a power outage of this duration, your department should consider installing uninterruptible power supplies (UPS's). If you have any questions or concerns regarding the test or the emergency power system, please feel free to contact Marc Dingle, Electrical Facilities Manager, at 4-8923 or 680-323-1819 Your continued cooperation in completing the code mandated emergency diesel generator test is greatly appreciated. -------------- next part -------------- An HTML attachment was scrubbed... URL: From HodgesA at upstate.edu Mon Dec 1 07:00:00 2025 From: HodgesA at upstate.edu (Anne Hodges) Date: Mon, 1 Dec 2025 12:00:00 +0000 Subject: [util] Generator Test: TU-3 & TU-4 Message-ID: TO:????????? All Departments with Space in TU-3 and TU-4 DATE:??????? December 2025 SUBJECT:????Generator Test: TU-3 and TU-4 Generator testing for TU3 & TU4 is scheduled for Tuesday, December 16, 2025, as follows: The test, although intended to simulate an actual power outage, has been modified to keep the disruption to hospital services at a minimum. If an actual power outage occurs, the electrical circuits supported by the generator will be without power for 5 to 10 seconds except for those areas which have their own uninterruptible power supplies. Our recent experience suggests that a real power outage can be expected once a year. If you have equipment, processes, etc. that cannot cope with a power outage of this duration, your department should consider installing uninterruptible power supplies (UPS's). ???? THE TU-3 TEST PROCEDURES ARE AS FOLLOWS: ??????The emergency generator will be started between 6:00 AM and 6:05AM and will be used as the source for emergency power for approximately 30 minutes. ??????The emergency power will be switched back to normal between 6:30AM and 6:35AM when the generator turns off. ??????Emergency outlets (red) and emergency lights will blink when the test starts and again when it ends. THE TU-4 TEST PROCEDURES ARE AS FOLLOWS: ??????The emergency generator will be started between 7:00AM and 7:05AM and will be used as the source for emergency power for approximately 30 minutes. ??????The emergency power will be switched back to normal between 7:30AM and 7:35AM when the generator turns off. ??????Emergency outlets (red) and emergency lights will blink when the test starts and again when it ends. If you have any questions or concerns regarding the test or the emergency power system, please feel free to contact Marc Dingle, Electrical Facilities Manager at 4-8923 or 680-323-1819. Your continued cooperation in completing the code mandated emergency diesel generator test is greatly appreciated. -------------- next part -------------- An HTML attachment was scrubbed... URL: From HodgesA at upstate.edu Mon Dec 1 07:00:00 2025 From: HodgesA at upstate.edu (Anne Hodges) Date: Mon, 1 Dec 2025 12:00:00 +0000 Subject: [util] Generator Test: TU-7 / Children's Pavilion Message-ID: TO:??? All Departments with Space in TU-7 / Children?s Pavilion DATE:??????? December 2025 SUBJECT:????Generator Test: TU-7 / Children?s Pavilion Generator test for TU-7 / Children?s Pavilion is scheduled for Tuesday, December 16, 2025: The test, although intended to simulate an actual power outage, has been modified to keep the disruption to hospital services at a minimum. If an actual power outage occurs, the electrical circuits supported by the generator will be without power for 5 to 10 seconds except for those areas which have their own uninterruptible power supplies. Our recent experience suggests that a real power outage can be expected once a year. If you have equipment, processes, etc. that cannot cope with a power outage of this duration, your department should consider installing uninterruptible power supplies (UPS's). ??? ??????The emergency generator will be started between 5:00 AM and 5:05AM and will be used as the source for emergency power for approximately 30 minutes. ??????The emergency power will be switched back to normal between 5:30AM and 5:35AM when the generator turns off. ??????Emergency outlets (red) and emergency lights will blink when the test starts and again when it ends. If you have any questions or concerns regarding the test or the emergency power system, please feel free to contact Marc Dingle, Electrical Facilities Manager at 4-8923 or 680-323-1819. Your continued cooperation in completing the code mandated emergency diesel generator test is greatly appreciated. -------------- next part -------------- An HTML attachment was scrubbed... URL: From HodgesA at upstate.edu Mon Dec 1 07:00:00 2025 From: HodgesA at upstate.edu (Anne Hodges) Date: Mon, 1 Dec 2025 12:00:00 +0000 Subject: [util] Generator Test: Building 49 Message-ID: TO:????????? All Departments with Space in Building 49 and the Campus Activities Building DATE:??????? December 2025 SUBJECT:????Generator Test: Campus Activities Building and Building 49 The next monthly test is scheduled for Friday, December 19, 2025. BUILDING 49 AND THE CAB TEST PROCEDURES ARE AS FOLLOWS: ??????The emergency generator will be started between 9:30AM and 9:35AM and will be used as the source for emergency power for approximately 30 minutes. ??????The emergency power will be switched back to normal operations between 10:00AM and 10:05AM when the generator turns off. ??????Emergency outlets (red) and emergency lights will blink when the test starts and again when it ends. The test, although intended to simulate an actual power outage, has been modified to keep the disruption to services at a minimum. If an actual power outage occurs, the electrical circuits supported by the generator will be without power for 5 to 10 seconds except for those areas which have their own uninterruptible power supplies. Our recent experience suggests that a real power outage can be expected once a year. If you have any questions or concerns regarding the test or the emergency power system, please feel free to contact Marc Dingle, Electrical Facilities Manager at 4-8923 or 680-323-1819. Your continued cooperation in completing the code mandated emergency diesel generator test is greatly appreciated. Thank you. -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: Building 49 Generator Test Notice .doc Type: application/msword Size: 32256 bytes Desc: Building 49 Generator Test Notice .doc URL: