May 2019 Archives by subject
Starting: Wed May 1 14:09:14 EDT 2019
Ending: Mon May 20 15:31:48 EDT 2019
Messages: 15
- [util]
UH Main Elevator #6 / OUT OF SERVICE / May 20th, - Wednesday,
May 22nd starting at 8:30 AM
Mary Lent
- [util] 550 Harrison Generator Test
Zaccariah Vanetti
- [util] Domestic hot and cold water interruption, Tuesday, May 14, 2 – 5 AM
Mary Lent
- [util] Annual Elevator Testing of Blue Elevators #1, #2, #3 and #4 /
Thursday, May 16th starting at 8:00 AM
Mary Lent
- [util] Closure of Mens Bathroom 2338 (Outside of Main Cafeteria)
Mary Lent
- [util] Correction Closure of Womens Bathroom 2337 (Outside of Main
Cafeteria)
Mary Lent
- [util] CWB #23 Freight Elevator / OUT OF SERVICE / Tuesday, May 21st
at 10:00 AM through Friday, May 24th, at 4:00 PM
Mary Lent
- [util] East Tower Generator Test
Zaccariah Vanetti
- [util] Gold Elevator #6
Zaccariah Vanetti
- [util] Monthly Code Blue System Test
Zaccariah Vanetti
- [util] Nurse Call Interruption
Zaccariah Vanetti
- [util] Orange Elevator #13
Zaccariah Vanetti
- [util] Parking Garage East and West Generator Test
Zaccariah Vanetti
- [util] UH CHET East Wing Generator Test
Zaccariah Vanetti
- [util] Update: Annual Elevator Testing of Blue Elevators #1, #2, #3
and #4 / Thursday, May 16th starting at 8:00 AM
Mary Lent
Last message date:
Mon May 20 15:31:48 EDT 2019
Archived on: Wed Mar 4 14:08:33 EDT 2020
This archive was generated by
Pipermail 0.09 (Mailman edition).