[util] Noise Notice / Monday, March 21st / 5:00 PM to 8:00 PM

Mary E. Lent LentM at upstate.edu
Mon Mar 21 12:27:26 EDT 2022


In support of the SPD Instrument Air Distribution Piping Construction Project, there will be Masonry wall core drilling this evening on the 3rd floor of University Hospital above the corridor ceiling at the double doors between East and North Wing near Pharmacy entrance.



Some noise and vibration may be experienced in immediately adjacent areas between 5:00 PM to 8:00 PM (or later if necessary).



The corridor width will be reduced to a minimum of 4'-6" as required for ICRA barrier.



If you have any questions, concerns or need to halt construction In case of an emergency please contact:



Nick Steffen at 315-530-8014 or steffenn at upstate.edu<mailto:steffenn at upstate.edu>

Jenny Ragan at 315-727-7275 or raganj at upstate.edu<mailto:raganj at upstate.edu>.


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.upstate.edu/pipermail/uh-utility/attachments/20220321/85b24134/attachment.html>


More information about the Uh-utility mailing list