[util] Power Interruption Downtown 01/24/26

Yvette Stewart StewartY at upstate.edu
Fri Jan 16 11:13:49 EST 2026


ELECTRICAL POWER INTERRUPTION NOTICE FOR
Downtown Campus Buildings

TO:                 All Departments with Space in UH, CWB/ROC
SUBJECT:    Electrical Power Interruption Notice for Downtown Campus
                          Buildings Saturday, Jan 24, 2026, from 4:00am - 6:00am
DATE:             January 16, 2026

On Saturday, January 24, 2026, between the hours of 4:00am - 6:00am there will be a power interruption 1-10 seconds to the buildings listed below while we do switch on one of our National Grid feeders.


  *   UH (Will check with 3 North OR's before we begin)
  *   CWB/ROC

This is what you can expect to happen between 4:00am to 6:00am.
An overhead page will be sent out prior to switching and once switching is completed.

  *   All normal power will see a power interruption for 1-10 seconds while we transfer power
  *   Emergency power will see a blink while going to generator power and then when power is transferred back to normal power. This is similar to our monthly generator testing.
  *   All sensitive equipment should be shut down during the switching.

All other campus buildings will not be affected by this work.

If you have any questions or require clarification of this notice, please contact Marc Dingle (680) 323-1819.

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.upstate.edu/pipermail/uh-utility/attachments/20260116/5b28eb84/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Power Interruption DT24.pdf
Type: application/pdf
Size: 127459 bytes
Desc: Power Interruption DT24.pdf
URL: <http://lists.upstate.edu/pipermail/uh-utility/attachments/20260116/5b28eb84/attachment.pdf>


More information about the Uh-utility mailing list