As part of the Renovation of the Student Lounge the following is going to occur.



On March 26th , the contractor will be doing background Air testing in the Southwest corridor of Weiskotten Hall.  This is the section of the hall that exits into the Addition on the 1st floor.  This section will be closed to traffic while the testing is going on.  This testing will start between 9 AM & 10AM and will take about 3 -4- hours.



Again, on March 29th the area will be closed until April 12th so that the contractor can abate the floor and install new flooring.



Everyone will be asked to use corridor 1322 until the work is complete starting on March 29th.



If you have any questions or concerns please call John Ders at 315-243-5974.


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.upstate.edu/pipermail/wh-set-utility/attachments/20240322/2119c595/attachment.html>


More information about the Wh-set-utility mailing list