[util] Planned Power Outage – Elizabeth Blackwell Street Buildings (January 10, 2026)

Jason Tarantino TarantiJ at upstate.edu
Fri Dec 26 07:38:06 EST 2025


Dear Team,
To support the Weiskotten Power Upgrade Project, all buildings located on Elizabeth Blackwell Street will experience a planned power outage on January 10, 2026, from 7:30 a.m. to 2:00 p.m. Normal power will not be available during this time.
Clark Hall, the Campus Activities Building, and Jacobsen Hall will be supplied by emergency power only. This includes red outlets and exit/stairwell lighting. Heating systems, general office and hallway lighting, and air-handling equipment will not be operational during the outage. Fire protection systems will continue to function normally.
Physical Plant staff will actively monitor emergency generators, building temperatures, and the restoration of equipment following completion of the work. If forecasted temperatures pose a risk of freezing conditions within the buildings, the outage will be postponed. In that event, the work will be rescheduled for January 17, 2026, and an updated notification will be distributed.
If you have any questions or concerns, please contact John Ders at 315-243-5974.
Thank you for your cooperation.



Best Wishes,

Jason Tarantino

Administrative Assistant Trainee
Physical Plant – Maintenance Operations Center
Upstate Medical University
Room 1806
315-464-4230
 "Tough times don't last but tough people do" - Robert H. Schuller
[image]
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.upstate.edu/pipermail/wh-set-utility/attachments/20251226/62d115a0/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Outlook-image.png
Type: image/png
Size: 6554 bytes
Desc: Outlook-image.png
URL: <http://lists.upstate.edu/pipermail/wh-set-utility/attachments/20251226/62d115a0/attachment.png>


More information about the Wh-set-utility mailing list