Starting on April 6th, the following is a list of cleanings the contractor will be performing. Start time will be 6AM.

These panels all need to be cleaned because of potential hazardous material. All are normal power on the floors and most of the S7A, S3B etc. are lab areas that will be affected.

Emergency power will still be available.

The lab panels are fed from the chase panels.  The lab panels will be cleaned first and then reenergized and then shut down again while the chase panels are being cleaned, all will be reenergized in about 10 minutes.

The chase panels will take about 10 minutes. The lab panels must have containment built in the hall and will require the containment stay in place until clean air is received.

April 6th  P3N, P4S, S3A, S3B, S3C, S4G, S4H, S4I.

P3N Needs to be cleaned.  It feeds panels S3A ,S3B, S3C.  The rooms affected are 3319, 3321, 3323, 3313, 3315, 3317. 3307, 3309, 3311.  Normal power will be shut down.

P4S Needs to be cleaned.  It feeds panels S4G, S4H, S4I.  The rooms affected are 4283, 4285, 4287, 4277, 4279, 4281, 4271, 4273, 4275.  Normal power will be shut down.

We are talking with the occupants in the lab spaces to minimize the impact.

 Emergency Power will not be affected.

 If you have any questions or concerns, please feel free to contact Johns Ders at 315-243-5974.


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.upstate.edu/pipermail/wh-set-utility/attachments/20260331/46453c30/attachment.html>


More information about the Wh-set-utility mailing list