[util] WHA electrical upgrade project
Yvette Stewart
StewartY at upstate.edu
Mon Apr 13 09:51:03 EDT 2026
Good morning,
To support the ongoing WHA electrical upgrade project, On April 22, 2026, the electrical contractor needs to shut down the normal power to the following areas in WHA: 7299, 7299A, 7299B, 7301, 7302 (Verizon Equipment). Those rooms are on the south end of the hall toward the (VA).
No Emergency Power will be affected
The power is scheduled to be down starting at 6:00 AM until 2:30 PM (7 hours). This will allow the contractor to disconnect existing circuitry in the chase panel and relocate/refeed circuits to previously installed temporary power panels and do the same with the existing room panels.
We have coordinated this shutdown with the occupants to minimize and interruptions.
If you have any questions or concerns, please feel free to contact me at 315-243-5974.
John Ders
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.upstate.edu/pipermail/wha-utility/attachments/20260413/b67af515/attachment.html>
More information about the Wha-utility
mailing list