[util] Planned Electrical Shutdown – WHA Sub-Basement Panel HSN (June 10, 2026)
Jason Tarantino
TarantiJ at upstate.edu
Tue Jun 2 11:16:10 EDT 2026
Hey Team,
In continuing support of the Weiskotten Hall Addition power upgrade, a planned electrical shutdown will be required.
Please see details below:
* Date: June 10, 2026
* Time: 6:30 AM – 2:30 PM
* Location: WHA Sub-Basement
* Panel Affected: HSN
* Impact:
Normal power will be temporarily shut down to the equipment listed below.
Emergency power will not be affected.
* Affected Equipment:
Heat Stairwell #1
Lights at North Mezzanine
Heater at Fire Pump
Heater Center Chase
Hoist for Chemical Tank
AHU 1 & 2 Condensate Return Pump
Heater Control Platform
Heater East Wall
Snow Melting System
Hoist on Door
AHU 1 & 2 Pumps (P1 & P2)
Pump 1 & 2 Hydronic Heat Control
* Additional Information:
This outage has been coordinated with end users, primarily the sub-basement mechanical spaces operated by Physical Plant.
If you have any questions or concerns, please feel free to contact:
John Ders
315-243-5974
Best regards,
Jason Tarantino
Administrative Assistant Trainee 2
Physical Plant – Maintenance Operations Center
Upstate Medical University
Room 1806
📞 315-464-4230
Tough times don’t last, but tough people do.
— Robert H. Schuller
[image]
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.upstate.edu/pipermail/wha-utility/attachments/20260602/abd9d48e/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image.png
Type: image/png
Size: 6554 bytes
Desc: image.png
URL: <http://lists.upstate.edu/pipermail/wha-utility/attachments/20260602/abd9d48e/attachment.png>
More information about the Wha-utility
mailing list