[util] Emergency Power Outage for WHA basement and 1st floor.
Thomas Slater
SLATERT at upstate.edu
Wed May 6 14:08:26 EDT 2026
In support of the ongoing WHA power upgrade, the following power outage is being scheduled. This outage has been coordinated with occupants to minimize impacts.
ELP-BN and ELP-1N are scheduled to be shutdown on May 12 starting at 9 AM to 11 AM
ELP-BN: 308 equipment room, 208V outlet in Constant temp room 308A, 308B, Evap unit, Fire Alarm Panel, Honeywell strobes.
ELP-1N: 1213 UPS Bypass panel, Door operator 1322B, Door FA Holder 1322A, 208V centrifuge 1213, 1297C, 1303, 1303D, 1312.
If you have any questions or concerns, please feel free to contact me at 315-243-5974.
John Ders
Thomas (Thom) Slater
He/Him/His
Upstate University Hospital
Physical Plant - Maintenance Operations Center
750 East Adams Street - Room UH-1806
Syracuse, NY, 13210
office hours: 07:00 - 16:30
e: slatert at upstate.edu
p: 315.464 .4230
f: 315.464.4711
direct extension: 315.464.7355
my office hours: 08:30-16:30
* "It takes courage to grow up and become who you really are." - EE Cummings
[cid:a47f32dc-7d93-4228-9b17-cb64f6bc0fdb]
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.upstate.edu/pipermail/wha-utility/attachments/20260506/86c91e27/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Outlook-p0iybrpw.jpg
Type: image/jpeg
Size: 9220 bytes
Desc: Outlook-p0iybrpw.jpg
URL: <http://lists.upstate.edu/pipermail/wha-utility/attachments/20260506/86c91e27/attachment.jpg>
More information about the Wha-utility
mailing list