[util] Planned Reheat Loop Shutdown – East Wing Floors 2–6 (May 5–6, 2026)
Jason Tarantino
TarantiJ at upstate.edu
Thu Apr 23 13:19:18 EDT 2026
To support the OR7 project, a planned shutdown of the reheat loop will be required. Please see details below:
* Date: May 5–6, 2026
* Time: 10:00 PM – 4:00 AM
* Location: East Wing
* Affected Areas: Floors 2–6
* Impact:
Limited control of individual room temperatures during the shutdown period.
This includes the Main ORs on the 5th floor and the Burn Unit on the 6th floor.
Airflow will not be affected.
* Scope of Work:
Replacement of the reheat coil line in Room E5622B.
* Additional Information:
Temperature adjustments for emergency cases in the ORs will be accommodated as needed.
Space heaters will be available for the Burn Unit if required.
If you have any questions or concerns, please contact:
Zekrullah Ahmady
315-518-8181
AhmadyZ at upstate.edu<mailto:AhmadyZ at upstate.edu>
Best regards,
Jason Tarantino
Administrative Assistant Trainee 2
Physical Plant – Maintenance Operations Center
Upstate Medical University
Room 1806
📞 315-464-4230
Tough times don’t last, but tough people do.
— Robert H. Schuller
[image]
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.upstate.edu/pipermail/ew-bh-utility/attachments/20260423/9515845d/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Outlook-image.png
Type: image/png
Size: 6554 bytes
Desc: Outlook-image.png
URL: <http://lists.upstate.edu/pipermail/ew-bh-utility/attachments/20260423/9515845d/attachment.png>
More information about the Ew-bh-utility
mailing list