[util] 1162 OR 7 - Davinci Robotics Shutdown.
Thomas Slater
SLATERT at upstate.edu
Fri May 1 14:34:11 EDT 2026
Good afternoon,
The OR7 contractor needs to perform a shutdown on the reheat loop that serves all rooms in the East Wing floors 2-6. This shutdown is needed to facilitate the replacement of the reheat coil line in rm E5622B. We have scheduled this work to begin on Tuesday, 05/05/26 at 2200, with an estimated completion time of 0400 on 05/06/26. During this shutdown, we will have limited control over individual room temperatures, but we should be able to make most adjustments with the fan systems for minimal impact. This will also affect the Main ORs on the 5th floor and the Burn Unit on the 6th floor. We should be able to accommodate any temp adjustments needed for emergency cases in the ORs as needed. Space heaters will be available for the Burn Unit as needed.
***Airflow will not be affected by this shutdown***
Any questions should refer to Zekrullah Ahmady 315-518-8181/AhmadyZ at upstate.edu<mailto:315-518-8181/AhmadyZ at upstate.edu>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.upstate.edu/pipermail/ew-bh-utility/attachments/20260501/de73127e/attachment.html>
More information about the Ew-bh-utility
mailing list