[util] R710 Power Outage at Weiskotten Hall on 9/12/26
Ana Santiago
SantiaAn at upstate.edu
Fri Sep 4 15:54:58 EDT 2026
UPSTATE PHYSICAL PLANT
NOTIFICATION
Notification Type:
Planned Outage
☐Other: __________________________
Utility / Service Affected:
Electrical
☐Other: __________________________
Subject:
R710 Power Outage at Weiskotten Hall
To support: DLAR Project
Date:
9/12/2026
Time(s):
0600 – 1800
Location:
Weiskotten Hall Sub basement
Affected Areas / Equipment
(Room, Equipment ID, etc.):
NE Wing of Weiskotten Hall
HVAC Equipment and ALL Normal Power will be off during this time. Meaning Lights, receptacles in All areas of the N+E Wing and Setnor Buildings. Fans fs-4 fs-5 be off causing reduced ventilation in several areas. Any equipment not plugged into a RED Emergency outlet. All identified equipment that needs emergency power will be transitioned in advance.
Impact (What will be interrupted
and what will remain operational):
During this time. R710 will be de-energized. All essential equipment will be fed by temporary power. R710 will remain de-energized for the duration of the separate shutdowns. This will ensure the safety of personnel working on the DLAR electrical upgrades.
Note:
This is a continuation of the shutdown for R710 from 09/11/26. Normal Power will be restored around 1800 on 09/12/26
Questions or Concerns
If you have any questions or concerns, please contact:
Name:
Marc Dingle
Name:
Ryan Clifford
Department:
Physical Plant
Department:
Design & Construction
Phone:
680-323-1819
Phone:
315-663-1856
Email:
dinglem at upstate.edu
Email:
clifforR at upstate.edu
Thank you for your cooperation and understanding while this work is being completed.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.upstate.edu/pipermail/wha-utility/attachments/20260904/cc9ef94b/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: DLAR CONTRACTUAL SHUTDOW 091226.docx
Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document
Size: 40029 bytes
Desc: DLAR CONTRACTUAL SHUTDOW 091226.docx
URL: <http://lists.upstate.edu/pipermail/wha-utility/attachments/20260904/cc9ef94b/attachment.docx>
More information about the Wha-utility
mailing list