March 2021 Archives by subject
Starting: Mon Mar 1 08:46:54 EST 2021
Ending: Wed Mar 31 10:32:52 EDT 2021
Messages: 20
- [util] (no subject)
Thomas Slater
- [util] .550 Harrison Generator Test
Thomas Slater
- [util] Annual Elevator Inspections / Monday, March 22nd through Thursday, March 25th
Mary E. Lent
- [util] East Tower Generator Test
Thomas Slater
- [util] East Wing Generator Test
Thomas Slater
- [util] Electrical Power Interruption affecting the 5th Floor on Saturday, March 6th, starting at approximately 7:00 am.
Mary E. Lent
- [util] Elevator #9 Closure Notice
Thomas Slater
- [util] Green Elevators (#9/#10/#11) Shutdown Notice / Friday, April 2nd / 3:30 AM - 5:30 AM
Mary E. Lent
- [util] Hot & Cold Water Interruption for the South Wing of UH / Tuesday March 23rd / 8:30 PM
Mary E. Lent
- [util] NAB Boiler Load Test / Tuesday, March 30th - Wednesday, March 31st / 8 AM - 5 PM
Mary E. Lent
- [util] Nurse Call Interruption
Thomas Slater
- [util] P-TUBE INTERUPTION NOTICE / Monday, March 29th through Friday, April 2nd
Mary E. Lent
- [util] Parking Garage East and West Generator Test
Thomas Slater
- [util] Radiant Heat Interruption / Wednesday, March 10th / Starting at approximately 5:30 am.
Mary E. Lent
- [util] Steam & Condensate Interruption / Thursday, March 25th / Starting 8:30 PM
Mary E. Lent
- [util] TU-3 TU-4 Generator Test
Thomas Slater
- [util] UH Generator Test (disregard previous email)
Thomas Slater
- [util] UH Service Elevator #7
Zaccariah Vanetti
- [util] UH Service Elevator #7
Zaccariah Vanetti
- [util] UH South Wing 3, 4, &5 Floor Heating and Cooling Shutdown / Thursday, March 25th / 6:00 AM - Noon
Mary E. Lent
Last message date:
Wed Mar 31 10:32:52 EDT 2021
Archived on: Wed Mar 31 10:32:58 EDT 2021
This archive was generated by
Pipermail 0.09 (Mailman edition).